Ostlänken - with travel center at Skavsta

Skavsta
Pågående

Through the Skavsta area, the new double-track railway Ostlänken and Skavsta Travel Center are being built. The image is a conceptual rendering of Skavsta Travel Center.

Ostlänken is being built by the Swedish Transport Administration, from Järna in the north to Linköping in the south. The groundbreaking ceremony took place in Gerstaberg (Järna) on November 6, 2024. According to the Swedish Transport Administration's plans, the entire Ostlänken route is scheduled to open for traffic in 2035. The Skavsta Travel Center is expected to be completed in 2032.

Easier transfers between train, bus, and plane

With a railway through Skavsta and a travel center centrally located near Stockholm Skavsta Airport, accessibility will increase, travel times will be shorter, and transfers between train, bus, and plane will be easier.

At Skavsta, Ostlänken will connect with a branch line from central Nyköping. A travel center is being built in close proximity to the airport terminal at Stockholm Skavsta Airport. The railway has therefore been positioned as close to the airport terminal building as possible to facilitate smooth transfers. In connection with the railway construction, roads will also be rerouted and traffic flows into and out of the Skavsta area will change.

Overall, Ostlänken and new roads will improve accessibility for those who operate and work in Skavsta, as well as for travelers getting to and from the area.

What's happening now?

Preparatory work is already underway in the area, and adaptations are being made within Stockholm Skavsta Airport's environment to enable the construction of Ostlänken. Among other things, preparations are being made for the relocation of the current long-term parking (P3). The Swedish Transport Administration has carried out remediation and excavation on the upper part of the current parking area. Hangars in the nearby area are being demolished to make way for a new long-term parking facility. The new parking facility is expected to be completed by autumn 2025 and will initially include approximately 800 parking spaces. The red marking on the map below shows the area for the new long-term parking.

skavsta

Developing Skavsta Travel Center and connecting terminals for bus, rail, and air is a collaborative effort between Stockholm Skavsta Flygplats AB, the Swedish Transport Administration, Region Sörmland, and Nyköping Municipality.  

The railway is being built in stages. For the section through Skavsta, the Swedish Transport Administration expects to have a contractor agreement finalized by August 2025. Construction is estimated to begin in 2026.  

Read more on the Swedish Transport Administration's website about the Sjösa - Skavsta section and Skavsta Travel Center.

Facts about Ostlänken

  • Ostlänken is a new double-track railway, approximately 160 kilometers long, connecting Järna and Linköping.
  • Skavsta is one of five new travel centers; the others are Vagnhärad, Nyköping, Norrköping, and Linköping.
  • The new railway will enable more trains, sustainable transport, smoother and safer journeys, and larger labor market regions.

Read more about Ostlänken on the Swedish Transport Administration's website.

Would you like to know more? Feel free to contact us!

Our projects

Arlandastad
Slutförda

Tunnel and main street

Integrated and well-planned – this is how the best conditions are created for a robust infrastructure in Arlandastad. The new tunnel under the E4 motorway significantly improves accessibility to the area. Beyond the full-scale tunnel, the upgrade of the main artery across the entire area is nearing completion.
Arlandastad
Pågående

F60 Business Park

F60 Business Park - a place for businesses of all sizes - a mix that creates positive synergies. This will be reflected in both the architecture and the overall site planning.
Arlandastad
Slutförda

Bankomat establishes a local office in Arlandastad

Bankomat has established one of its regional offices – premises that include office spaces, depots, and cash counting centers – in Arlandastad Group's development area, Arlandastad.
Arlandastad
Slutförda

Stockholm Hotel Apartment - Longstay

Stockholm Hotel Apartment, an extended-stay hotel, meets the demand for flexible accommodation options for longer stays and is being built with a focus on sustainability.
Arlandastad
Slutförda

Bake My Day

Bake My Day offers artisanal, authentic, and generous patisserie and bakery experiences. This requires the right location, suitable premises, and collaboration. It is precisely for this reason that the company has chosen Arlandastad for its new bakery, spanning approximately 10,000 square meters.
Skavsta
Pågående

Nyköping Municipality's new vocational high school in Skavsta

The project encompasses a total of approximately 6,700 sqm of premises and 3,500 sqm of land area. The new school facilities will collectively accommodate 330 students. Occupancy will take place in phases, with the first occupancy scheduled for January 2027.
Skavsta
Pågående

Skavstalund Quarter - for those who want to be part of building Skavsta

The Skavstalund district offers commercial development opportunities for businesses looking to contribute to the growth and development of Skavsta.
Arlandastad
Pågående

Training Academy

Arlandastad offers the space and ideal conditions for a unified hub for sports, health, and innovation.
Arlandastad
Pågående

Scandinavian XPO Stage 2

Scandinavian XPO is evolving and adapting to welcome even more businesses and visitors! You can now find serviced offices, training facilities, showrooms, a health center, and a golf training center here. What does your business need?
Arlandastad
Slutförda

Autohero in Arlandastad

30,000 m² to accommodate over 1,300 parking spaces and approximately 1,100 m² of expanded facilities for Autohero.